Stainless Steel Pipework

Stainless Steel Pipework

Supporting a major Municipcal Wastewater Treatment site, The WA Cooke Group completed this bespoke fabrication and installation of a stainless steel pipe re-route.

Our operatives were employed to route water from a free standing tank through an inlet into a building. The pipework had to be supported at high level and was to maintain a standard safe distance from the undulating ground level. Accurate measurements were taken and the correct angles were calculated to ensure the stainless steel pipework was routed correctly.

Once fabricated to specification, the supports were installed and the pipework supported in position. Working under specific time pressures to conform to the water shut off availability, our team performed professionally and efficiently to ensure a safe and effective installation.